Note 03 · Work mix and labor
What is inside your MH/ton?
Change the work mix and labor per pick. See why the same MH/ton can describe very different operations.
Data model
One working example connecting steel quantities to crew time, crane demand, and measured progress. Try the interactive examples below and follow the sequences in the erection plan. The current example contains 1,505 short tons, 3,087 model pieces and 2,642 planned crane picks.
Each step converts the same project information into a more useful planning and control decision.
Interactive production examples
Explore 9 interactive examples, from picks and crew-days to the 4D model, completion gates and earned-value S-curves. Each example connects back to the note that explains it.
Note 03 · Work mix and labor
Change the work mix and labor per pick. See why the same MH/ton can describe very different operations.
Note 04 · Picks and crew time
Erect 10 tons using different piece weights and pick groupings. Follow the effect on picks, crew time, and labor.
Note 05 · Duration and labor
Adjust work-class rates and raising-gang size for one steel erection sequence. Connect crew-days to duration, labor, and MH/ton.
Note 06 · Schedule and resources
Move three work packages through an eight-week schedule. Compare crane demand, raising-gang staffing, and the finish one crane can support.
Note 07 · Crews and handoffs
Move the raising gang and follow-on crews through six work areas. Compare faster erection with more welding capacity.
Note 08 · Completion and earned credit
Update five operations in 25% increments. See weekly claimed completion turn budgeted hours into earned credit.
Note 09 · Flow and throughput
Start with a hike, then switch to steel erection. Change the pace of the work and see what controls the finish.
Note 10 · Model, schedule and progress
Select an erection sequence in the model and Gantt schedule. Compare planned timing with accepted completion gates, earned labor and actual hours.
Note 11 · Progress and performance
Compare three labor and schedule scenarios. Move the status date to see cumulative hours, performance ratios and variances.
Sequence quantities, installed units, pick classifications, production rates, crew-days and planned man-hours.
Time-phased sequence durations with weekly crane activity and manpower demand.
Budget allocation, completion gates, claimed value, actual hours and earned-value reporting by operation and sequence.
On a large microchip fab project, I worked with the project manager and superintendent to connect model quantities, the existing schedule and agreed completion gates for a box-truss operation. Weekly updates helped the team review progress, manpower needs and inventory for two cranes. The team reused the process in Phase 2. That application focused on scheduling and progress claiming; it did not include all the production tracking explored in these production examples.